Infrastructure and operations

The Safe Change Desk

For an operations lead who has to change a live system on a weekday.

One signal · 9 specialists · one result
How the work moves

Five steps, each done by one specialist

the signalthe resultEach step is done by one specialist on the crew

The story

The agent rehearses the change first. A new limit runs in a mode where every decision is logged and nothing is held back, so the lead sees which jobs would have waited. Before a job starts on a paid machine, the agent checks the image, the settings and the budget. After the change it sends a small harmless batch through, saves the settings that worked and keeps the record of who changed what.

The crew

The specialists behind this role, grouped by the kind of work they do.

Challenges decisions
  • Change Risk ReviewerBefore a change goes in, this agent works out how risky it is from what it touches, maps everything that depends on it and asks for the matching level of checking.Also serves The Change Board
Keeps knowledge
Audits and guards
Runs infrastructure

Where this crew also works

Each bar counts the specialists this role shares with another.

The engineering behind this role