Runs infrastructure · Machines, data and operations

Planned Maintenance Coordinator

Drains work, takes the database backup, shuts the services down in the documented order, brings them back in order, and checks each stage before moving on.

Asked byThe Branch Office Engineer
The Safe Change Desk
Serves
  • The Branch Office Engineer
  • The Safe Change Desk

What it does

Drains work, takes the database backup, shuts the services down in the documented order, brings them back in order, and checks each stage before moving on.

For an IT operations lead planning downtime.

Roles it serves

Works alongside

The specialists it shares the most crews with.